2024–25 · Brighton
Re-engineer and resurface Mt Vernon Street
Resident asks to resurface the steep, narrow, pothole-filled Mt Vernon St and rebuild the sidewalk as one full-width sidewalk on a single side, since it currently disappears halfway.
English title and summary written with AI from the resident's text.
The resident's idea, as submitted
The idea
Completely re-engineer and resurface Mt Vernon St. This is a steep narrow street full of potholes and has a sidewalk that just disappears half-way. Sidewalk should be moved to just one side so it can be full-width, and street should be repaired
Details
- Cycle
- 2024–25
- Submitted
- July 23, 2024
- Neighborhood
- Brighton
- Place
- Mount Vernon Street, Brighton, 02135
- Portal category
- Streets & Sidewalks
- How it was submitted
- Individual submission
- Submission language
- English
- Themes
- Street & sidewalk repair
Themes grouped with AI from resident idea text.
The same need in other cycles
Ideas in Street & sidewalk repair from Brighton in the other cycles, up to 3 from each.
2026–27 (1 matching)
2025–26 (5 matching)
- Repave and fix crossing timing at intersectionResident asks for a longer crosswalk timer, repaving and reset tracks at a bumpy intersection so people of all ages and abilities can cross safely.2025–26Brighton
- Fix sidewalks, potholes and speeding on Brighton streetResident reports inaccessible sidewalks, potholes and fast drivers on a narrow street used by school kids and families, and asks for repairs and safety improvements.2025–26Brighton
- Better roads, street lights and street cleaningResident wants infrastructure improvements, mainly roads, street lights and street cleaning days.2025–26Brighton