2025–26 · Brighton
Better roads, street lights and street cleaning
Resident wants infrastructure improvements, mainly roads, street lights and street cleaning days.
English title and summary written with AI from the resident's text.
The resident's idea, as submitted
The idea
Its mainly infrastructures in terms of roads, street lights and street cleaning days
Details
- Cycle
- 2025–26
- Submitted
- July 23, 2025
- Neighborhood
- Brighton
- Place
- Oak Square, Brighton
- Portal category
- Streets & Sidewalks
- How it was submitted
- Community partner workshop
- Partner organization
- Allston Brighton Health Collaborative
- Submission language
- English
Themes grouped with AI from resident idea text.
The same need in other cycles
Ideas in Street & sidewalk repair from Brighton in the other cycles, up to 3 from each.
2026–27 (1 matching)
2024–25 (9 matching)
- Level sidewalks at driveway curb cutsResident asks to remove driveway curb cuts that interrupt sidewalks and level them to remove steps, for accessibility.2024–25Brighton
- Fix potholes or mark street as privateResident asks the city to either repair potholes on a street or post a sign saying it is private and for residents only.2024–25Brighton
- Repair Eastburn Footway stairsResident asks to fix the deteriorating Eastburn Footway stairs, which would improve access to the Winship school.2024–25Brighton