Skip to content
Office of Participatory BudgetingIdeas in Action
2025–26 · Brighton

Repave and fix crossing timing at intersection

Resident asks for a longer crosswalk timer, repaving and reset tracks at a bumpy intersection so people of all ages and abilities can cross safely.

English title and summary written with AI from the resident's text.

The resident's idea, as submitted

The idea

This intersection is a nightmare. The crosswalk timer is not long enough to cross the street, and the intersection is bumpy and a tripping hazard. The tracks need to be re-set and the road repaved. Especially since the marathon goes through here!

Who it helps and why

Will allow for a safer crossing for people of all ages and physical abilities.

Details

Cycle
2025–26
Submitted
July 16, 2025
Neighborhood
Brighton
Place
Chestnut Hill Avenue, Brighton, 02135
Portal category
Streets & Sidewalks
How it was submitted
Individual submission
Submission language
English

Themes grouped with AI from resident idea text.

The same need in other cycles

Ideas in Street & sidewalk repair from Brighton in the other cycles, up to 3 from each.

All Street & sidewalk repair ideas from Brighton