2026–27 · FenwaySubmitted in Chinese
Schedule road repairs at low-disruption times
Resident asks that road repair work be scheduled when it will not disturb residents and when commuter pressure is low.
English title and summary written with AI from the resident's text, submitted in Chinese.
The resident's idea, as submitted
Submitted in ChineseThe idea
将道路维修的时间调整在不扰民,通勤压力低的时候
Details
- Cycle
- 2026–27
- Submitted
- August 6, 2026
- Neighborhood
- Fenway
- Place
- Boston, 02215
- Portal category
- Streets & Sidewalks
- How it was submitted
- Individual submission
- Submission language
- Chinese
- Themes
- Street & sidewalk repair
Themes grouped with AI from resident idea text.
The same need in other cycles
Ideas in Street & sidewalk repair from Fenway in the other cycles, up to 3 from each.
2025–26 (0 matching)
No ideas in this theme and place that cycle.