2024–25 · Fenway
ADA-accessible pedestrian overpass at BU Beach
Resident asks to rebuild the BU Beach pedestrian overpass so it is fully ADA accessible, as it currently has only stairs.
English title and summary written with AI from the resident's text.
The resident's idea, as submitted
The idea
Rebuild the Pedestrian overpass at BU Beach so it is fully ADA accessible. Currently only stairs :-(
Details
- Cycle
- 2024–25
- Submitted
- July 22, 2024
- Neighborhood
- Fenway
- Place
- Charles River Bike Path Overpass @ BU, Boston, 02215
- Portal category
- Facilities
- How it was submitted
- Individual submission
- Submission language
- English
Themes grouped with AI from resident idea text.
The same need in other cycles
Ideas in Street & sidewalk repair from Fenway in the other cycles, up to 3 from each.
2026–27 (2 matching)
- Schedule road repairs at low-disruption timesResident asks that road repair work be scheduled when it will not disturb residents and when commuter pressure is low.2026–27FenwaySubmitted in Chinese
- Schedule road repairs at low-disruption timesTranslated from Chinese: the resident asks that road repairs be scheduled at times that don't disturb residents and when commuter pressure is low.2026–27FenwaySubmitted in Chinese
2025–26 (0 matching)
No ideas in this theme and place that cycle.