2024–25 · Allston
Bike and pedestrian link from BU Bridge to river path
Resident asks for a bike and pedestrian connection from the BU Bridge to the Charles River path on the Boston side, matching the Cambridge side.
English title and summary written with AI from the resident's text.
The resident's idea, as submitted
The idea
Build a bike & pedestrian connection from BU Bridge to the Charles River path on the Boston side. There is a connection to the bike path on the Cambridge side but not on the Boston side.
Details
- Cycle
- 2024–25
- Submitted
- July 22, 2024
- Neighborhood
- Allston
- Place
- Boston University Bridge, Boston, 02215
- Portal category
- Facilities
- How it was submitted
- Individual submission
- Submission language
- English
Themes grouped with AI from resident idea text.
The same need in other cycles
Ideas in Pedestrian & bike safety from Allston in the other cycles, up to 3 from each.
2026–27 (11 matching)
- Redesign Union Square in Allston for pedestrian safetyResident asks to redesign the dangerous Union Square intersection for pedestrians and to expand the empty plazas with events, food trucks and picnic tables to support the neighborhood.2026–27Allston
- Redesign Harvard Ave in AllstonResident asks to redesign Harvard Ave with protected bike lanes, wider sidewalks, and pickup zones instead of street parking, addressing litter, broken sidewalks, dangerous crossings, and double parking.2026–27Allston
- Close Linden and Reedsdale crossing over Green LineResident asks to close the crossover letting drivers on Linden and Reedsdale Streets cross the Green Line tracks, which delays trains and creates hazards for pedestrians.2026–27Allston