2024–25 · City-wide
Accessibility assessment of sidewalks and transit with wheelchair users
Resident asks for a collaborative assessment with wheelchair and stroller users to find accessibility problems in sidewalks and public transit, and for 1% of the budget to go to participatory budgeting.
English title and summary written with AI from the resident's text.
The resident's idea, as submitted
The idea
Do a collaborative assessment with people who use wheelchairs and strollers to identify areas with accessibility problems in our sidewalks and public transportation system. & allocate 1% of the city budget by participatory budgeting.
Who it helps and why
Working families and disability justice
Details
- Cycle
- 2024–25
- Submitted
- August 13, 2024
- Neighborhood
- City-wide
- Portal category
- Streets & Sidewalks
- How it was submitted
- Individual submission
- Submission language
- English
Themes grouped with AI from resident idea text.
The same need in other cycles
City-wide ideas in Street & sidewalk repair from the other cycles, up to 3 from each.
2026–27 (31 matching)
- Finish patching roads and bike lanesComplete patching of roads and bike lanes so people can get around without damaging tires or injuring ankles.2026–27City-wide
- Fill potholes and repave streets citywideThe resident asks for funds to fill potholes and repave streets, noting the worst streets are in Dorchester and Mattapan and that potholes damage cars and worsen traffic.2026–27City-wide
- Build more sidewalksConstruct more sidewalks.2026–27City-wideSubmitted in Korean
2025–26 (22 matching)
- Smoother sidewalks, public restrooms, shade and business incentivesResident asks for smoother, non-slip sidewalks, more public bathrooms, more shaded recreation areas and incentives for small businesses.2025–26City-wide
- Maintain streets for pedestrian safetyResident asks for street repair and maintenance to keep pedestrians safe.2025–26City-wideSubmitted in Chinese
- Repair damaged roads and sidewalks, add accessibility featuresResident asks for repairs in badly damaged areas such as Kneeland St, Blue Hill Ave and Harvard Ave: filling potholes, resurfacing, better drainage, fixing sidewalks and adding accessible ramps and tactile paving.2025–26City-wideSubmitted in Chinese