2024–25 · Dorchester
Faster sidewalk repair turnaround
Resident asks for faster completion of sidewalk repairs, saying they have waited a year for theirs to be fixed.
English title and summary written with AI from the resident's text.
The resident's idea, as submitted
The idea
Improve how long it takes to do job - I have been waiting 1-year to get my sidewalk repaired
Who it helps and why
help to improve the neighborhood
Details
- Cycle
- 2024–25
- Submitted
- July 31, 2024
- Neighborhood
- Dorchester
- Place
- Callender Street, Dorchester, 02124
- Portal category
- Streets & Sidewalks
- How it was submitted
- City-sponsored workshop
- Submission language
- English
- Themes
- Street & sidewalk repair
Themes grouped with AI from resident idea text.
The same need in other cycles
Ideas in Street & sidewalk repair from Dorchester in the other cycles, up to 3 from each.
2026–27 (3 matching)
- Clear or widen blocked bridge sidewalkResident asks to relocate lighting and drawbridge equipment blocking the bridge sidewalk or widen it, since it is hostile to wheelchair users, strollers, and cyclists on a key Dorchester-UMass route.2026–27Dorchester
- Repair bike path between Neponset Greenway and HarborwalkResident says the path linking the Neponset Greenway and Harborwalk is a dilapidated sidewalk that is dangerous to bike on.2026–27Dorchester
- Fix roads to reduce accidentsResident asks the City to fix roads to reduce vehicle accidents.2026–27DorchesterSubmitted in Korean